Two field crew standing in front of switchboard inside warehouse

Technical documents

TECHNICAL DOCS  |  STANDARD WORK PROCEDURES

These documents and attachments are for use by Energex electrical contractors, consulting engineers, architects and others directly concerned with electrical installations connected or to be connected to Energex supply mains.

Whilst care is taken in the preparation of this material, we do not guarantee the accuracy and completeness of the information at the time of publication.

Energex and our related companies will not be responsible for any loss, damage or costs incurred as a result of any errors, omissions or misrepresentations in relation to the material contained in these documents.

To be notified of the latest document updates, you can subscribe to our online notification service.

  • Developer Design & Construct Estates
  • Complete manuals
  • Large Customer Connections

Enter search term:

EQL Joint documents
File Name Date Uploaded Size
Standard for Oil Containment - 3062359 10/10/2023 (575kb)
Substation Metering Standard - 3061818 10/10/2023 (402kb)
Standard for Climate and Natural Hazard Resilience - 3057510 10/10/2023 (305kb)
Standard for Selection of Surge Arresters - 3055929 10/10/2023 (953kb)
Standard for Insulation Co-ordination - 3058912 10/10/2023 (640kb)
Standard for Substation Lighting - 2949685 10/10/2023 (195kb)
Standard for Electric and Magnetic Field Design - 3060782 10/10/2023 (1mb)
Standard for Substation Ventilation and Air Conditioning - 3055324 10/10/2023 (317kb)
Electrical Safety Rules 2022 - 6503074 11/10/2023 (2mb)
Guide for Reactive Plant in Substations - 3059908 11/10/2023 (527kb)
Standard for CVT Monitoring - 8332893 11/10/2023 (291kb)
Standard for Switchgear Selection - 12743722 25/10/2023 (340kb)
Standard for Cables and Cable Installations - 12737281 17/11/2023 (1mb)
STNW3471 - Queensland Public Lighting Design Manual v4 08/12/2023 (4mb)
Standard for DC Supplies - 3062917 08/01/2024 (6mb)
Standard for Clearances in Air - 3054141 15/01/2024 (1mb)
Network Physical Security - Design Reference - 13158190 17/05/2024 (973kb)
Standard for Audible Noise in Substations - 22968176 11/02/2025 (1mb)
Standard for Substation Fire and Explosion Protection - 3058013 13/02/2025 (657kb)
Standard for Busbar Conductor Selection - 3062690 13/02/2025 (1mb)
Joint Supply & Planning Manual - 3056869 27/05/2025 (1mb)
Network Labelling and Signage Manual - Version 1 19/06/2025 (33mb)
Queensland Public Lighting Construction Manual V14 04/07/2025 (60mb)
Standard for Substation Equipment Identification - 2947172 09/07/2025 (2mb)
Substation Construction Manual - 2915421 (Release V6) 11/07/2025 (1mb)
Standard for Substation Design Requirements - 20468486 11/07/2025 (1mb)
Standard for HV Equipment Ratings - 26945507 17/07/2025 (1mb)
Energex Manuals
File Name Date Uploaded Size
STD00978 (BMS03329) Pole Transformer Fusing Standard 17/09/2014 (566kb)
Distribution Earthing Manual FAQs - 13080103 31/07/2023 (0)
Distribution Earthing Standard - 3061992 (Previously RED 00758) 31/07/2023 (2mb)
Operating Practices Manual - 7670455 24/08/2023 (15mb)
00302 OHDM - Limit State (Issue 14) 10/11/2023 (20mb)
Commercial & Industrial Substations Manual - Manual 00293 27/11/2023 (49mb)
Underground Distribution Construction Manual version 27 08/12/2023 (94mb)
10882 - Fibre Broadband Network Standards 26/09/2024 (10mb)
OHCM Full Version (South East) 11/02/2025 (44mb)
Standard for Operating Practices - Work Involving the Energex Low Voltage Network - 7371353 01/09/2025 (609kb)
Energex Developer Design & Construct Estates
File Name Date Uploaded Size
Reconfiguring An Allotment 25/07/2006 (90kb)
Works Plan Standard - Electricity - RED 00991 previously BMS 02167 06/01/2016 (634kb)
Pole Inspection Form - Contestable Works 06/09/2021 (213kb)
C-0038 - EQL - Contestable Works - Operational Update - LGA Approval 12/04/2022 (165kb)
C-0041 - Energex - Contestable Works - Operational Update - Subdivision Standards v1 05/07/2022 (162kb)
C-0044 - Energex - Contestable Works - Operational Update - Fast Track Certificate of Supply 16/09/2022 (209kb)
Consultant Checklist Certificate for Electricity Supply Form 2019 (28_08_2022) 16/09/2022 (292kb)
As Constructed Drawing Standard - 2597742 (Previously RED 01037) 13/06/2023 (485kb)
00367 - Resource Estimation Guide 08/02/2024 (10mb)
Form 8799 Energex Accredited Underground Civil Service Providers (15052024) 15/05/2024 (195kb)
F1448 Subdivision Application Form 08/07/2024 (168kb)
F1383 Public Lighting Application Form 08/07/2024 (150kb)
Form 8562 Approval to Construct (ATC) 10/07/2025 (71kb)
Energex Estimating with Pictures Ver 09 August 2025 15/09/2025 (2mb)
Compatible Unit Listing - Overhead (Excel) 29/09/2025 (592kb)
CU Breakdown - Overhead (Excel) 29/09/2025 (1mb)
Compatible Unit Listing - Underground (Excel) 29/09/2025 (334kb)
CU Breakdown - Underground (Excel) 29/09/2025 (414kb)
Compatible Unit Listing - Distribution Substations (Excel) 29/09/2025 (93kb)
CU Breakdown - Distribution Substations (Excel) 29/09/2025 (112kb)
Compatible Unit Listing - Streetlighting (Excel) 30/09/2025 (270kb)
CU Breakdown - Streetlighting (Excel) 30/09/2025 (335kb)
Approved Products List (Form 2020) 03/10/2025 (2mb)
EQL Major Customer Connections
File Name Date Uploaded Size
Large Customer Connection Construction Detail Information - 3022 28/10/2013 (243kb)
Submission Checklist for Customer Substations -1328 13/02/2019 (264kb)
STNW1179 Standard for Plant Energisation 18/08/2025 (1mb)
Contestable Works Operational Updates
File Name Date Uploaded Size
Significant Incident Brief 05/04/2019 (32kb)
C-0002 Operational Update 03_12_18 - Subdivisions 03/12/2018 (77kb)
URD Contractor news letter Q1 2019 17/06/2019 (315kb)
Interim Working Live OH open wire 19/06/2019 (304kb)
Direction No.2 - Live open wire LV works 24/06/2019 (2mb)
C-0004 Operational Update Contestable Works Safety Awarness 22/07/2019 (57kb)
URD Contractor news letter July to Oct 2019 08/10/2019 (336kb)
Capturing of span heights and ambient temperatures after re-tensioning or reconductoring - No T-1563 07/01/2020 (206kb)
T-1563 - Capturing of span heights and ambient temperatures after re-tensioning or reconductoring 09/01/2020 (206kb)
URD Contractor Newsletter October to December 2019 13/01/2020 (301kb)
Form 0641 Energex Contestable Works Electrical Contractor Completion Package Information 07042020 07/04/2020 (223kb)
C-0007 Energex Operational Update Contestable Works 07042020 07/04/2020 (594kb)
C-0010 Contestable Works - Energex Operational Update - Commissioning Forms 22/05/2020 (850kb)
C-0011 Energex Operational Update - Small lot LV switching fees 26/05/2020 (53kb)
C-0012 Contestable Works - Energex Operational Update - Community Title Schemes v2 01/06/2020 (66kb)
C-0015 Energex - Contestable Works - Operational Update - Payment of Design Application Fees 25/06/2020 (59kb)
C-0016 Energex - Contestable Works - Operational Update - Submission of Wayleaves 17/07/2020 (60kb)
C-0017 Energex - Contestable Works - Operational Update - "For Construction" drawings 25/07/2020 (58kb)
C-0019 Energex - Contestable Works - Operational Update - Fees and Charges 2020_21 v2 26/08/2020 (79kb)
Contestable Works - Core work activities v1 16/11/2020 (663kb)
C-0021 Energex_Ergon - Contestable Works - Operational Update - Christmas planned outages 2020 16/11/2020 (51kb)
C-0023 Ergon_Energex Contestable Works Operational Update - Changes to Audit Reports 16/11/2020 (79kb)
C-0020 v2 Energex - Contestable Works - Operational Update - PMT location and clearances 17/11/2020 (720kb)
Circular - EQ UCA 2020 - Information Regarding Wage Increases and Allowances (Core Work) 05/01/2021 (0)
C-0024 Energex - Contestable Works - Operational Update - 11kV feeder spurs 05/02/2021 (237kb)
Contractor Bridging Course Comms - 16.02.2021 19/02/2021 (109kb)
Energex - Multi-Unit Commercial Industrial - Operational Update - 06082021 16/08/2021 (255kb)
C-0026 Energex Operational Update - HV Recipient - Primary Point of Contact 30/08/2021 (216kb)
C-0027 Energex Operational Update Contestable Work - LV Circuit Ties 01/09/2021 (436kb)
C-0029 Energex_Ergon Operational Update Contestable Works - Contract Execution and Payments 15/09/2021 (198kb)
C-0030 Ergon Energex Christmas 2021 Planned Interruptions - Contestable Works 18/10/2021 (221kb)
F3109 PMT drawing submission checklist 25/10/2021 (219kb)
C-0031 Energex_Ergon Operational Update - Connections Contract Obligations - Contestable Works 02/11/2021 (240kb)
Contestable Works Re-Authorisation Framework 05/11/2021 (280kb)
C-0034 Energex - Pole Inspection Form 06/01/2022 (409kb)
C-0035 Energex - Contestable Works - Operational Update - Fast Track – Certificate of Supply 08/03/2022 (165kb)
C-0036 - EQL - Contestable Works - Operational Update - Bulk Issuing of Site & Operational ID’s 08/03/2022 (184kb)
Consultant Checklist Certificate for Electricity Supply Form 2019 08/03/2022 (192kb)
No T-1835 - Low Voltage Switching Operator Authorisation 03/11/2022 (293kb)
C-0054 Christmas 2023 Planned Interruptions 13/11/2023 (161kb)
C-0056 Energex As Constructed Requirements 05/02/2024 (155kb)
C-055 EQL - Contestable Works Process Change Enquiry Stage 05/02/2024 (209kb)
C-0053 EQL Audit Compliance Specialist Team 05/02/2024 (135kb)
C-0052 EQL Contestable Works Site Visit Requirements 05/02/2024 (614kb)
C-0039 Energex Contestable Fees & Charges 2022/23 29/10/2024 (242kb)
C-0040 Ergon Contestable/Public Lighting Fees & Charges 2022/23 29/10/2024 (268kb)
C-0041 Energex Contestable Subdivisions Standards 29/10/2024 (162kb)
C-0042 EQL Contestable Application Forms V2 29/10/2024 (162kb)
C-0043 Energex Contestable Partnering Agreement 29/10/2024 (203kb)
C-0044 Energex Contestable Fast Track COS 29/10/2024 (209kb)
C-0045 EQL Contestable Secuirty Bonds 29/10/2024 (80kb)
C-0046 Energex As Constructed Drawings 29/10/2024 (188kb)
C-0047 Energex Contestable Fast Track COS Update 29/10/2024 (167kb)
C-0048 EQL Contestable Worksplan Standard 29/10/2024 (719kb)
C-0049 Ergon Contestable/Public Lighting Fees & Charges 2023/24 29/10/2024 (165kb)
C-0050 Energex Contestable Fees & Charges 2023/24 29/10/2024 (255kb)
C-0056 EQL As Constructed Requirements 29/10/2024 (155kb)
C-0057 Ergon Contestable Pedestrian Crossing Designs 29/10/2024 (140kb)
C-0058 Energex Contestable Fees & Charges 2024/05 29/10/2024 (192kb)
C-0060 EQL Contestable LV Drop Requirements 29/10/2024 (433kb)
C-0059 Ergon Contestable Fees & Charges 2024/05 29/10/2024 (187kb)
C-0061 EQL Christmas 2024 Planned Interruption Moratorium 29/10/2024 (162kb)
C-0062 EQL COS Requests 29/10/2024 (136kb)
C-0063 Abutting Structures on Freehold Lots (Terrace Housing) 04/11/2024 (0)
C-0065 EQL - Contestable Works - Prohibition on operating switches on HV Equipment 12/05/2025 (139kb)
C-0067 Energex - Contestable Works - Operational Update - Construction Authorities Site Supervisor 06/06/2025 (112kb)
C-0068 Energex - Timely Submission of Completion Packages 13/06/2025 (130kb)
C0069 - Contestable Works - Operational Update - Process Change - ATC v2 10/07/2025 (189kb)
C0071 - Energex - Contestable Fees & Charges 2025/26 25/07/2025 (199kb)
C0070- Ergon - Contestable Fees & Charges 2025/26 25/07/2025 (0)
Ergon Manuals
File Name Date Uploaded Size
Underground Construction Manual (Northern/Southern) 10/10/2023 (88mb)
Standard for Substation Signage - 2941554 10/10/2023 (2mb)
Standard for Distribution Line Design Overhead - 2938244 10/10/2023 (18mb)
Overhead Sub-Transmission Construction Manual v7 (Ergon Complete) 16/10/2023 (508mb)
Dynamic Ratings E3 Transformer Manager Application and Settings Guide for Ergon Energy - 12993358 25/10/2023 (0)
STNW3046 - Standard for Interlocking - 3060386 17/11/2023 (4mb)
STNW3392 - Standard for use of CAD Software - 2946203 17/11/2023 (399kb)
RSD04 - Distribution Design Drafting Standard Specification - 2934528 17/11/2023 (226kb)
Standard for Distribution Line Design Underground - 3054145 19/04/2024 (2mb)
RSC10 - Specification for UDC Electrical Testing - 2882968 08/08/2024 (437kb)
Overhead Construction Manual Ergon Iss 29 13/05/2025 (486mb)
Subtransmission Legacy Standard Like for like Replacements Issue 6 22/09/2025 (25mb)
Standard for Electrical Design and Construction Requirements for Chamber Substations - 2916892 03/10/2025 (601kb)
Standard for Site Selection and Construction Requirements for Chamber Substations - 2933331 03/10/2025 (497kb)
Ergon Developer Design and Construct Estates
File Name Date Uploaded Size
F1383 Public Lighting Application Form 08/07/2024 (150kb)
F1448 Subdivision Application Form 08/07/2024 (168kb)
Form 8562 Approval to Construct (ATC) 10/07/2025 (71kb)
Approved Products Lists Ergon (Form 2020) 03/10/2025 (2mb)